Reality Check - Forum

Please login or register.

Login with username, password and session length
Advanced search  

News:

Welcome to Reality Check!
Feel free to Browse around and add RELEVANT Content...

collapse

* Reality Shoutouts

Refresh History
  • Hollywood: Japan shaking: Dozens injured after 6.4-strong earthquake hits east of Kumamoto [link]
    April 16, 2016, 10:22:54 pm
  • Hollywood: Powerful earthquake hits Japan, collapsing houses (April 14, 2016) - Part 1 [link]
    April 16, 2016, 10:13:38 pm
  • Hollywood: Powerful 7.8-magnitude earthquake strikes northwest Ecuador [link]
    April 16, 2016, 10:12:11 pm
  • Hollywood: Earthquake : M 7.8 - 27km SSE of Muisne, Ecuador: PAGER - YELLOW ShakeMap - VIII DYFI? - VI Time2016-04-16 23:58:37… [link]
    April 16, 2016, 08:46:21 pm
  • Hollywood: :o
    April 14, 2016, 03:10:17 am
  • Hollywood: 8)
    December 18, 2015, 09:57:40 am
  • Hollywood: Soooo....how the Forum looking PeePs?  ;D
    July 13, 2015, 04:19:44 am
  • Hollywood: M 5.2 - 195km SW of Bella Bella, Canada and  M 5.1 - 128km W of Ferndale, California both ends of the Cascadia Fault...
    January 02, 2015, 06:46:28 am
  • Hollywood: 8)
    August 26, 2014, 11:07:25 pm

* Forum Menu

Pages: [1]   Go Down

Author Topic: Decision to Dismantle Cover Over Damaged Fukushima Reactor 'Questionable'  (Read 245 times)

0 Members and 1 Guest are viewing this topic.

Hollywood

  • Administrator
  • Sr. Member
  • *****
  • Karma: +5/-0
  • Offline Offline
  • Gender: Male
  • Posts: 259

http://sputniknews.com/analysis/20150516/1022209934.html
Quote
MOSCOW (Sputnik) — TEPCO said that it hoped to start the actual removal of the cover, which was installed by the company in 2011 to mitigate the damage done to the plant, in a week.

The overall dismantling process is expected to take about a year and will be followed by a cleanup of the wreckage and waste left inside the unit since the hydrogen blast. TEPCO expects that in 2019 it will start the extraction of nuclear fuel assemblies from the spent fuel pools.

Fukushima Daiichi nuclear power plant was severely damaged in March 2011 after being hit by a 46-foot tsunami triggered by a massive offshore earthquake. Some of the reactors’ coolant systems failed, precipitating multiple hydrogen-air chemical explosions. Three of the six reactors went into meltdown, resulting in the release of radiation into the atmosphere, soil and sea.

“It [the cover] was … meant to protect the environment from the dispersion of radioactive particles. Of course, these risks continue beyond the taking off of the cover: rainwater washing out radioactivity that enters the ocean, heavy storms impacting water and nitrogen injection systems,” Mycle Schneider, an independent analyst on Energy and Nuclear Policy, said.

He cited the International Atomic Energy Agency, that has stated in its latest report that this decision may lead to "higher radiological and conventional safety risks to the work force."

At the same time Peter F. Caracappa, an instructor and director of the Walthousen Reactor Critical Facility from the Rensselaer Polytechnic Institute, does not think there is a reason to consider TEPCO’s decision untimely.

He stressed that the most short-lived products generated by accident have decayed away, leaving the longer-lived materials, which will decay slowly over the next years.

“The radiological hazard from the remaining materials will be only a little different a year or five years or ten years from now, whereas the physical condition of the facility will only deteriorate as time progresses,” Caracappa told Sputnik.

The expert believes that TEPCO was able to adequately estimate the situation before the decision was made.

TEPCO had previously sought to start the preparations for the dismantling by March 2014 but these plans were postponed due to equipment problems.
Logged
Pages: [1]   Go Up
 


* Reality Check - Social Intergration

Reality Check - Home


Page created in 0.426 seconds with 19 queries.