Reality Check - Forum

Please login or register.

Login with username, password and session length
Advanced search  

News:

Welcome to Reality Check!
Feel free to Browse around and add RELEVANT Content...

collapse

* Reality Shoutouts

Refresh History
  • Hollywood: Japan shaking: Dozens injured after 6.4-strong earthquake hits east of Kumamoto [link]
    April 16, 2016, 10:22:54 pm
  • Hollywood: Powerful earthquake hits Japan, collapsing houses (April 14, 2016) - Part 1 [link]
    April 16, 2016, 10:13:38 pm
  • Hollywood: Powerful 7.8-magnitude earthquake strikes northwest Ecuador [link]
    April 16, 2016, 10:12:11 pm
  • Hollywood: Earthquake : M 7.8 - 27km SSE of Muisne, Ecuador: PAGER - YELLOW ShakeMap - VIII DYFI? - VI Time2016-04-16 23:58:37… [link]
    April 16, 2016, 08:46:21 pm
  • Hollywood: :o
    April 14, 2016, 03:10:17 am
  • Hollywood: 8)
    December 18, 2015, 09:57:40 am
  • Hollywood: Soooo....how the Forum looking PeePs?  ;D
    July 13, 2015, 04:19:44 am
  • Hollywood: M 5.2 - 195km SW of Bella Bella, Canada and  M 5.1 - 128km W of Ferndale, California both ends of the Cascadia Fault...
    January 02, 2015, 06:46:28 am
  • Hollywood: 8)
    August 26, 2014, 11:07:25 pm

* Forum Menu

Pages: [1]   Go Down

Author Topic: TV: Underground wall around Fukushima reactors started “leaning”  (Read 228 times)

0 Members and 1 Guest are viewing this topic.

Hollywood

  • Administrator
  • Sr. Member
  • *****
  • Karma: +5/-0
  • Offline Offline
  • Gender: Male
  • Posts: 259

http://bit.ly/1Y3haYD
Quote
NHK World, Nov 25, 2015 (emphasis added): Groundwater wall at Fukushima plant leans slightly — The operator of the damaged Fukushima Daiichi nuclear plant has found that a wall it built 30 meters into the ground to block the flow of radioactive water is leaning slightly.

TEPCO built the steel barrier along a coastal embankment to stop contaminated groundwater from seeping into the sea… TEPCO inspectors found that the wall is leaning up to some 20 centimeters toward the sea. They say this is due to the pressure of the groundwater flow.

The officials also blamed rising groundwater levels for cracks found in the embankment pavement. The utility says workers are buttressing the wall with steel pillars…

NHK (Google translation), Nov 25, 2015: In TEPCO Fukushima Daiichi nuclear power plant, it can be seen that the equipment called “impervious wall”, which was completed last month in order to reduce the outflow of the contaminated groundwater, are slightly tilted to the seaside… The pavement of the seawall also cracked… When depends on the Tokyo Electric Power Company, after the “impervious wall” has been completed, it is that it’s because the water level of the land side of the groundwater is rising.

Fukushima Minyu Shimbun (Google translation), Nov 26, 2015: …  sea side wall is inclined about 20 centimeters at the maximum to the sea side, cracks of up to about 1 centimeter has occurred in the pavement of the seawall.

That inclination and cracks have occurred in almost the entire sea side wall… TEPCO, rain water enters the cracks of the pavement, so that the groundwater does not surge, is promoting the repair to block the cracks spraying resin.